Carbon Canyon Water Recycling Facility

14950 Telephone Avenue
Chino, California 91710

Carbon Canyon Water Recycling Facility (CCWRF) is located in the city of Chino and has been in operation since 1992. The design hydraulic domestic sewage (wastewater) treatment capacity is 11.4 million gallons per day. The plant serves areas of Chino, Chino Hills, Montclair, and Upland. The plant treats the liquid portion of an average influent wastewater flow of approximately 7 million gallons per day.

The liquid treatment section consists of preliminary screening and grit removal, primary clarification, secondary treatment by aeration basins and clarification, tertiary treatment by filtration and disinfection, and dechlorination. Wastewater liquid is treated to California Department of Public Health Title 22 Code of Regulations standards for disinfected tertiary recycled water. The solids removed from CCWRF are pumped to RP-2 for thickening, anaerobic digestion and dewatering.

Click here to read about our Wastewater Treatment Process.

Carbon Canyon Water Recycling Facility Photos
(click to view larger)

Wastewater Treatment Process Diagram

Carbon Canyon Water Recycling Facility Map